UpBuilding a Project > UpConfiguring Build Tool > UpTo configure Build Tools Previous Next

Apply

Changed contents are applied.

image

The build tool to be added should have the following prerequisites

When you want to add a build tool or change the executing order of the build tool, be careful about the execution sequence and then make the settings.


Previous Next

All Rights Reserved, Copyright (C) FUJITSU LIMITED 2003-2005